Index page [<< First] [< Previous] [Next >] [Last >>]
of 14
6b.JPG
The first house, now 25 Camp Street, was begun in 2023, on the first section below the original owners’ property. At the same time, Camp Street itself, and the new sub-division road, Baham Way, was widened and sealed. The bridge on Camp Street, the link between the sub-division and lower Camp Street was widened and reinforced; it now can have two cars pass each other.