BROAD BAY RESERVE / PBO RD DESIGNS
Level 2 delays have scrapped the planned consult @ BBCC Hall (the work is moving along too fast!), but there is an online form for community feedback before 2 October (end of next week).
![](https://broadbay.co.nz/wp-content/uploads/2020/09/BB-ReservePBO-Rd-Plans-2-1024x572.jpg)
Level 2 delays have scrapped the planned consult @ BBCC Hall (the work is moving along too fast!), but there is an online form for community feedback before 2 October (end of next week).