Wall Buttressing Work @ Turnbulls Bay
Hello All Work is due to start soon on the final stage of the Turnbulls Bay Slip repair which involves the installation of rocks in two locations at the bottom for the wall. The reason for the rock is two-fold – to protect foundation areas from tidal movement and to protect the integrity of the wall structure in extreme events i.e. seismic movement. The planned buttressing works were included in the original design but could not be carried…